Clearwell Reservoir Rehabilitation and Repairs
PVB provided shop drawings, materials, fabrication, equipment, and installation for galvanized structural framing for the Tucson Water Clearwell Reservoir Rehabilitation and Miscellaneous Repairs.
As well as fabrication and installation of hot dip galvanized steel, PVB’s scope included demolition of various identified purlins and girders for shear wall construction, removal of bridge angle members, and modifications to existing purlins and girder joints per plan and specifications.
PVB installed new purlins in kind, replaced missing bridging members, and modified existing handrailing. New bracing was fabricated and installed. PVB completed this project 21 days ahead of schedule.
Location
Tucson, Arizona
Services
- Design
- Procurement
- In-House Fabrication
- Construction
- Structural Steel