PCR MEH Expansion, East and West Construction
PVB provided labor, equipment, materials, tools, transportation, supervision, consumables, services, and documentation to construct, pre-operational testing, and commissioning of the new PCR MEH Blower Station.
Tasks included excavation, electrical, construction of two new tire walls, concrete placement for pump bases, pipe supports, thrust blocks, duct bank, light pole bases, mechanical setting of blower and motor alignment, including safety instrumentation pre-check. Electrical and instrumentation included installation and testing.
The raceway system included complete power, control, instrumentation, and lighting. PVB also completed fiber optic installation to existing PLC cabinet, all low and medium voltage cables, grounding and lighting including field install of light fixtures.
Location
Morenci, Arizona
Services
- Earth Work
- Civil/Concrete
- Construction
- Structural Steel
- Piping
- Electrical and Instrumentation